Time flies… I have been working on my new darkroom but have not posted any images of my work. Most of the time I spent building two sinks out of plywood and then sanding and coating them with several layers of shellac, polyurethane paint and epoxy resin. 2 gallons of paint and 3 gallons of epoxy resin. Then I installed a ceiling in my space. And 2 pieces of 4×8′ plywood to mount all equipment. I had a lot of fun soldering copper pipes for water plumbing: there were a lot of corners, t-joints and thread adapters. Oh, and filters for cold and hot water are also in place. And on a top of that Wing Lynch electronic water temperature controller I bought on eBay. And exhaust ventilation all finished too. Everything is ready for the sinks!





0 Responses.